Medium Voltage Calculations против Prysmian Group Conduit Fill Использование & Stats

The most complete tool to support the calculation of high voltage electrical installations. Free sections: - Determination of the characteristics of the equipment: rated voltage (Ur), withstand at industrial frequency (Ud), withstand type of lightning (Up), short-term current (Ik) - Sizing of low and medium voltage insulated cables (≤ 30 kV) - Calculation criteria for admissible current, voltage drop, short circuit and protection, consideration of different factors for reducing the admissible current: temperature, thermal resistivity of the ground, grouping, sun exposure, etc. - Multiple installation methods: tray, buried, under pipe, in the air ... - Visualization of protection relay trip curve and MV cable admissible current - Protection with transformer limiting fuses - Earth fault current calculation (isolated neutral and earth) - PE conductor - Transformer performance and voltage drop - Primary/secondary conversions in voltage and current transformers - Secondary voltage of a transformer acoording to switch position - Calculation of the transformation center ventilation needs - Five safety rules - Consult ANSI codes electrical protections - Tray sizing - Representation of 1 IEC curve - Parameter configuration Voltages, frequency, conductivity of the conductor material, temperature MV specific: list type, cable bundle (flat / staggered) Regulation of LV protections - Possibility of sharing results Purchases In-App: - Calculation of short circuits and impedances with the maximum and minimum values, type diagram with the following configuration: Network, Transformer, MV line, LV line - Selection of voltage and current transformers (protection and measurement), capacitor bank of the transformer, calculation of the number of insulators - Protection and adjustment of the transformer overcurrent relay, selectivity with low voltage switch (Ir, Isd, Ii), graph of the actuation curves and identification of characteristic points - Calculation of medium voltage line (short line model, single circuit) with conductors: AL1 / ST1A (LA), AL1 / S20SA (LARL), AL3 / ST1A (DA), AL3 (D) - Dimensioning and checking of protective and service grounding installation, system configuration, calculation of Howe parameters, step and contact voltages, distance between grounding, single grounding, additional safety measures and results checking - Representation of up to 3 IEC curves with different voltage levels - Removal of ads with any purchase made IN NO CASE SHALL THE AUTHOR BE LIABLE FOR ANY DIRECT OR INDIRECT DAMAGES AS A RESULT OF THE CORRECT OR INCORRECT USE OF THE APPLICATION Attribution icon: Icons made by smalllikeart from www.flaticon.com
  • Apple App Store
  • Бесплатный
  • Продуктивность

Рейтинг магазина

- -

Prysmian Group’s Conduit Fill calculator is a quick and easy tool to calculate the minimum conduit size per National Electrical Code. It is designed for engineers, contractors, and other electrical professionals to find quick answers without spending hours on lengthy calculations. Features: Code Selection for NEC® 2011, 2014, and 2017. Metric or standard conductors Allowable fill rates for combination of conductors Calculates minimum conduit size for compact stranded conductors Over fifty different types of insulation Over ten different conduit types Results show total area required, nipple size, and minimum conduit size
  • Apple App Store
  • Бесплатный
  • Продуктивность

Рейтинг магазина

- -

Medium Voltage Calculations vs. Prysmian Group Conduit Fill ranking comparison

Compare Medium Voltage Calculations ranking trend in the past 28 days vs. Prysmian Group Conduit Fill

Rank

Нет данных

Рейтинг Medium Voltage Calculations против Prysmian Group Conduit Fill в сравнении по странам

Сравните динамику рейтинга Medium Voltage Calculations за последние 28 дней с динамикой рейтинга Prysmian Group Conduit Fill.

Нет данных для отображения

Сравните данные с любым сайтом, воспользовавшись бесплатной пробной версией

Начать
Medium Voltage Calculations VS.
Prysmian Group Conduit Fill

декабрь 24, 2024