Rate Analysis vs Site Diary - Construction使用状況と統計

“Rate Analysis” is a unique app which has rate analyses of all major construction items. These rate analyses have been derived from years of experience in the construction industry. It is a must have app for developers, architects, interior designers, civil engineers, contractors, estimators & can also prove an useful tool for persons who are building their own house or doing interior works. Features: 1) Gives you rate analysis of construction items for standard quantity 2) Gives the flexibility to enter your project quantity & get rate analysis for the same 3) Gives material requirement & costing for standard quantity as well as your entered quantity 4) Gives flexibility to enter your rates for material & labour & gives total cost for your entered rates 5) You can edit the material/labour names, constants and rates and save them as My rate analysis. 6) You can convert the rate analysis in Image format & save/ share it for your records 7) Material/Labour rates are updated periodically. 8) It is very easy to access & use. Rate analysis helps you to finalize material specification, do the project budgeting, plan your purchases, cross check material consumption & to achieve cost control.
  • Apple App ストア
  • 無料
  • 生産性

ストアランキング

- -

Site Diary app replaces the existing paper construction daily reports, site journal or daily logs, where field workers make a report of things that occurred on their projects. With Site Diary app, we make the whole process quick, fun and simple so you both have a detailed daily report and time left to focus on building more. We developed Site Diary to address the needs of site engineers, foremen and site managers working in construction organizations, contractors and installation teams both large and small. "Site Diary allowed me to keep track of construction progress and emerging issues in real time” - Christopher Pletcher, Municipal Engineering Manager, Ayres Associates Task management/allocations feature The first product to integrate daily reports and task management. Users can create a task, add information about the task (manpower, equipment & materials to be used) and the persons it assigned to. Report progress on a task by creating a work log. The diary form will be automatically filled with all the task info which will make it a lot quicker for users to fill their daily reports. Site Diary Features include - Real-time site progress and monitoring, whereby users have visibility of work being done by site staff. Submitted reports are immediately available for review and approval by off-site personnel. - Share information. The app will allow field workers to send an email after they create an event. (This is optional) - Local weather report automatically included - every report entry is automatically linked with the prevailing weather conditions for that site at the time, which is important information to include in a daily construction report app. - Added images - photos and other images can be attached to reports. - Offline support - Sites with limited connectivity are not a problem as the app continues to perform seamlessly off-line. Data captured is saved on the device and synchronized to the cloud as soon as a connection becomes available. - User management - Add and remove users in your team - Set up site resources (labour, equipment, materials, contractors, tags) that you will use on your construction site. Tags are used to determine the type of event that is recorded, example: Safety. - Export Reports - This can be used as shift updates or project summaries and shared with staff, contractors and clients. These are done in either PDF, Excel or CSV format.
  • Apple App ストア
  • 無料
  • 生産性

ストアランキング

- -

Rate Analysis対Site Diary - Constructionランキング比較

と過去28日間の Rate Analysis ランキング傾向を比較 Site Diary - Construction

ランキング

ご利用可能なデータがありません

Rate Analysis 対 Site Diary - Construction 国の比較によるランキング

と過去28日間の Rate Analysis ランキング傾向を比較 Site Diary - Construction

表示できるデータはありません

無料トライアルで任意のサイトと比較する

始める
Rate Analysis VS.
Site Diary - Construction

12月 24, 2024